CLEINT: Alumno
LOCATION: Sheffield
VALUE: £27M
Park Hill, Sheffield
BACKGROUND
OOBE is involved in the third phase of the redevelopment of Sheffield’s iconic Park Hill Estate.
THE CONCEPT
The proposed landscape masterplan takes into consideration the existing character and features within the space for this listed student accommodation scheme. Overall the design takes a ‘light-touch’ approach, retaining existing walls and ramps, making good and resurfacing where possible.
DEVELOPMENT AND MASTERPLAN
Outdoor spaces reflect the architectural functions within the building: The lower level spaces provide a range of areas for outdoor socialising, dining and study, as well as potential commercial break-out space adjacent to the commercial zone within the building. Planting is key to defining and shaping the space. A central lawn is located at the heart of the scheme and is framed by low-maintenance planting to buffer views from private flats. Existing trees and grassland will be maintained and enhanced along Talbot Street and the east and western outer façades. These areas will be enhanced by additional ‘pioneer species’ tree planting and areas of long meadow grass.
RESULTS
A landscape masterplan that responds to the site’s heritage. The tenant-led landscape proposals maximise the use of external spaces and proposals are framed within an enriched soft landscape.